We completed a grading plan to satisfy ADA and parking requirements. It also included the buliding of a retaining wall in the back as extensive excavation was needed to level the parcel. In addition, we completed the foundation that was needed for the docking area to be able to withstand greater loads generated by commercial vehicle transit.